 |
| The area to the left shows a new fill area under
construction with a liner to prevent the entry of
liquids from the trash into the groundwater. The
area to the right shows a slope covering several
hundred feet of buried trash with an active trash
fill area on top. |
 |
| This shows a close up view of the daily unloading
area. When this area is full, daily operations will
move to a new fill area in another part of the landfill.
|
| |